
At BOA AG, a KUKA robot welds not only quickly, but also with high quality.
A solution for processing welding tasks faster, more cost-effectively and with high quality. These were BOA AG’s requirements when opting for a TIG welding cell with a KUKA robot for the manufacture of sheet-metal constructions.
Implementation / Solution
A KUKA KR 15 L6/2 robot works at two work stations in a cell planned by LISTEC Schweißtechnik AG. Both stations are equipped with a DKP 400 two-axis positioner in order to provide the required flexibility. Different parts with varying batch sizes are produced at the two work stations. The robotic system is equipped with a TIG weld power source with cold filler wire from ESAB.
System components / Scope of supply
- KR 15 L6/2 - KR C2
Results / Success
The system is highly flexible and the KUKA robot works at high speed and with great accuracy. For a process that used to take about two hours, the robot requires just 13 minutes. The weld seams are always of consistent length and consistent quality. KUKA Robotics Corp. USA
Contact Supplier
Click here to see all KUKA Robotics Corp. USA News |